-
ꁸ Top
-
ꂅ 139 9028 1983
-
ꀥ QR code
The Blowout Prevention System
Is another major component of the rig. Its primary function is to control an imminent “blowout”. A blowout is an uncontrolled flow of formation fluid to the surface. A blowout usually begins as a “kick”, which is an intrusion of any high-pressure subsurface formation fluid into the well bore. This intrusion may lead to a blowout if it is not immediately handled by the crew. In order to stop a “kick” from becoming a blowout, the blowout prevention system is used.
Scope of Supply: BOP hoist, BOP test unit, Armed hose, Accumulator air bag …
-
ꁸ Top
-
ꂅ 010-8895 1088
-
ꀥ QR code
Products & Service
—
Contact Us
—
Tel: +86 139 9028 1983
E-mail: marvin.sales@agosltd.com
Address: No.89,Hezuo Road, High-tech Development Zone, Chengdu 610041, P.R.China.